Email:sales@zxcrusher.com

Home > News

How to do the dustproof work of cone crusher

Time: 2022-02-11 Writer: zhongxin

Cone crusher is a relatively common ore crusher equipment. Because the working nature of cone crusher is different and the materials processed are also different, it will cause dust to fly around, which is more harmful to on-site personnel and equipment. Therefore, in order to prevent dust , generally use water seal. The dust-proof water seal is a device that prevents dust from entering the cone crusher and causing premature wear of the parts.

Cone crusher

How does the cone crusher do the dustproof work? Only if the dustproof work is done well, the equipment can be better protected. The structure of the cone crusher is designed with a bearing seat, and the annular groove on the spherical bearing seat can hold water without freezing liquid. In addition, a truncated cone-shaped dustproof ring is welded on the conical drive body, which can effectively prevent the entry of dust. In addition, the lower end is inserted into the water in the groove, and the dustproof ring blocks the dust and makes it fall into the water tank.

The dust is kept out of the crusher by the dust ring, and the dust accumulated in the water sealing device can be washed away by the circulating water. In addition, at the drain in the sink, install a drain nozzle, and at the water inlet, install a water inlet. The circulating water should be sent from the special water tank to the water tank through the pipeline by the pump, and the return water will flow back to the water tank from the drain pipe along the pipeline.

In order to maintain the of the water seal and prevent dust from entering the cone crusher, the following work must be done: use clean water for the water seal, and minimize its sediment, so that it can play a role. The water used for the water seal should be appropriate, and the water should not overflow from the edge of the water seal, nor should it be less than the flow required by the water seal. When the cone crusher is in the outage time of a shift, especially in the cold winter, it is necessary to s* the water supply, and the water in the water seal can be drained *. When replacing the dustproof rubber ring, we should pay attention to keep a gap of about 2-3 mm between the dustproof rubber ring and the edge of the dustproof ring on the cone drive body.

PrevThe use of vibrating screen in crushing production line

NextReasons affecting the performance of impact crusher

Related Products >>

top