Email:sales@zxcrusher.com

Home > News

How to quickly solve the problem of jaw crusher operation failure?

Time: 2024-01-29 Writer: zhongxin

Jaw crusher is a commonly used crushing equipment in the mining field. It has a large crushing capacity and is often used in primary crushing equipment. It has a significant impact on the processing of large ores. Jaw crusher is an indispensable equipment in the crushing and sand making production line. Due to the high working intensity of the jaw crusher, the materials to be crushed are *ly stones with high hardness and large particle size, and the working environment is not good. In this case, failure will inevitably occur after long-term use. How to solve the problem quickly?
 

Jaw crusher

Jaw crusher

Jaw crusher is used to crush hard and large pieces of raw materials. Strong vibration during operation is normal and the reinforced concrete structure is stable. After operation, if there are signs of cracks or looseness, they must be adjusted in time to avoid affecting safe operation.

Long-term impact and stone wear caused large holes in the bottom plate of the jaw crusher, making repair welding impossible. This requires measuring the width of the base plate and the length of the welded joint, which can be checked by a technician. After the welding repair is completed, it can be reinstalled and production can be resumed.

1. The discharge port of the jaw crusher is blocked, causing the material in the crushing cavity and silo to be blocked.

2. The belt is loose or slipping, and the motor cannot drive the groove and grinding wheel.

3. The voltage is too low, resulting in insufficient motor power.

4. The jaw crusher bearing is damaged.

Solutions to Jaw Crusher Operation Failures

1. After s*ping the machine, clean the blockage in the discharge port and the cavity, and allow the discharge port to recover smoothly.

2. Tighten the belt or replace it with a new one directly.

3. Contact the power supply bureau or check the transformer to make sure the voltage reaches normal value.

4. Replace with new bearings and resume production.

PrevWhat should you pay attention to when starting the vertical shaft impact crusher?

NextHow to improve the efficiency of sand making machines through structure and principles

Related Products >>

top